The new investment projects being implemented in the district were studied in the presence of the head of Rishton district. In particular, the project by “Straus Farm” LLC was reviewed, which involves the installation of drip and sprinkler irrigation systems on a 4-hectare land plot, as well as the production of construction materials (bricks and slab products for facades). During the study, problematic issues raised by the project initiator were examined on-site, and appropriate instructions were given for their resolution.